Search found 115 matches

by commissioner
October 3rd, 2013, 10:48 pm
Forum: Transportation
Topic: Green Line / Central Corridor construction thread (archive)
Replies: 1597
Views: 360663

Re: Green Line (Central)

There is near each one, It's basically a small metal structure maybe 20' by 10' give or take with a bunch of electronic equipment that controls the switches and signals. The best example of what I'm talking about is the blue structure next to the Midway McDonalds
by commissioner
October 3rd, 2013, 9:32 pm
Forum: Transportation
Topic: Green Line / Central Corridor construction thread (archive)
Replies: 1597
Views: 360663

Re: Green Line (Central)

lrvopdude might have a better explaniation but those are interlocking signals for the lrv's. They are the same ones as on the Hiawatha line (Blue line). My guess is they are testing them to make sure they work. I have seen others on the green line that have been lit up for a time then go dark again....
by commissioner
October 2nd, 2013, 4:43 pm
Forum: Transportation
Topic: Saint Paul Union Depot
Replies: 374
Views: 80006

Re: Saint Paul Union Depot

There's work going on by 52 and near the wye complete with 4 car ballast train, and saw a new signal bungalow by the end of the platform.
by commissioner
October 2nd, 2013, 4:39 pm
Forum: Transportation
Topic: Green Line / Central Corridor construction thread (archive)
Replies: 1597
Views: 360663

Re: Green Line (Central)

The overhead wire is all the way to the OMF but is tensioned only to Chatsworth. Poles are going up in the omf yard and they have been laying track there. Also they have been testing signals various places along the line. Any idea of when everything will be cut in?
by commissioner
August 12th, 2013, 9:57 am
Forum: Transportation
Topic: Type II LRVs - Siemens S70
Replies: 153
Views: 32244

Re: Type II LRVs - Siemens S70

The train barn by 52 won't be ready for a while yet judging by what I saw. No catenary strung yet, not to mention that they are just starting now to lay track under 52. They could theoretically do it without the tracks outside, there's a double crossover right inside the building and all the tracks ...
by commissioner
July 11th, 2013, 2:08 pm
Forum: Transportation
Topic: Green Line / Central Corridor construction thread (archive)
Replies: 1597
Views: 360663

Re: Green Line (Central)

They only have catenary strung on the south side of the bridge as of tuesday.
by commissioner
June 20th, 2013, 10:55 pm
Forum: Transportation
Topic: Green Line / Central Corridor construction thread (archive)
Replies: 1597
Views: 360663

Re: Green Line (Central)

The dark poles go to just past the prospect park station toward Mpls. While both sets look neat, I'm suprised they didnt go with the same color all the way through, maybe the U wanted it that way?
by commissioner
June 19th, 2013, 10:56 pm
Forum: Transportation
Topic: Blue Line LRT
Replies: 629
Views: 256439

Re: Blue Line (Hiawatha)

Does anyone know how long the bike/walking trail between the DTE station and Cedar riverside is going to be closed for?
by commissioner
June 19th, 2013, 12:23 am
Forum: Transportation
Topic: Green Line / Central Corridor construction thread (archive)
Replies: 1597
Views: 360663

Re: Green Line (Central)

I knew it was opening next year but thanks anyway fishmarket
by commissioner
June 18th, 2013, 6:32 pm
Forum: Transportation
Topic: Green Line / Central Corridor construction thread (archive)
Replies: 1597
Views: 360663

Re: Green Line (Central)

Anyone know if the green line is still on schedule with the rain we've had and when is the Hiawatha lrt bike trail supposed to reopen? Thanks in advance!
by commissioner
June 11th, 2013, 12:54 am
Forum: Transportation
Topic: Green Line / Central Corridor construction thread (archive)
Replies: 1597
Views: 360663

Re: Green Line (Central)

If only. It could only go as far as the West Bank station at this point, I think. Caternary is still absent for stretches up to the East Bank station, and I don't know if all the necessary TPSS's are installed to make that possible anyway. Pretty much all the TPSS's are installed afaik, but except ...
by commissioner
May 23rd, 2013, 6:37 pm
Forum: Transportation
Topic: Green Line / Central Corridor construction thread (archive)
Replies: 1597
Views: 360663

Re: Green Line (Central)

That's been like that since last winter, From the looks of it some snowplow driver nailed it (there was a pile of snow in front of it). They were stringing catenary near 280 today and bases for signals went in.
by commissioner
April 28th, 2013, 7:06 pm
Forum: Transportation
Topic: Green Line / Central Corridor construction thread (archive)
Replies: 1597
Views: 360663

Re: Green Line (Central)

Is there certain times that they are testing the trains on the Green Line?
by commissioner
April 26th, 2013, 12:22 am
Forum: Transportation
Topic: Green Line / Central Corridor construction thread (archive)
Replies: 1597
Views: 360663

Re: Green Line (Central)

The poles are pretty much all up except for 4th Street downtown and the yard.
by commissioner
April 6th, 2013, 9:19 am
Forum: Transportation
Topic: Green Line / Central Corridor construction thread (archive)
Replies: 1597
Views: 360663

Re: Green Line (Central)

If you're talking about the black fence, that's to keep people from crossing the tracks wherever there isn't a crosswalk (which does absolutely no good by the way, the ones by the U work way better)