Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby Bakken2016 » September 26th, 2017, 6:16 am

gopherfan wrote:
September 17th, 2017, 4:08 pm
Caught a glimpse of one of the new C Line articulated bus going Southbound on 35W last week near the UofM operating as a route 250! Was driving, so no picture...
I work for MT, we have one articulated bus painted like an A Line(aBRT) because we were going to run it for the state fair, but due to construction on the ford parkway bridge they decided against it. So it is one of the newest Artics we have in our fleet, but not want the C Line buses will look like!

Silophant
Moderator
Posts: 3525
Joined: June 20th, 2012, 4:33 pm
Location: The Gateway

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby Silophant » September 26th, 2017, 7:14 am

I've seen a aBRT painted bus running through downtown recently displaying "C Line Testing" on its display boards. Is that the same one you're talking about, or is that an actual new C Line bus?

Tcmetro
Wells Fargo Center
Posts: 1276
Joined: May 31st, 2012, 8:02 pm
Location: Chicago (ex-Minneapolitan)

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby Tcmetro » September 26th, 2017, 9:19 am

I would imagine that the BRT painted artic is the same one from the Fair. They had one running on the suburban express buses. It had a 344x number IIRC.

Bakken2016
Union Depot
Posts: 326
Joined: September 20th, 2017, 12:40 pm
Location: North Loop

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby Bakken2016 » September 26th, 2017, 1:40 pm

Silophant wrote:
September 26th, 2017, 7:14 am
I've seen a aBRT painted bus running through downtown recently displaying "C Line Testing" on its display boards. Is that the same one you're talking about, or is that an actual new C Line bus?
Yes this is the same one from the fair, they are still putting the plans together for the C Line Artics. They are testing so Service Development can schedule the C Line most efficiently.

gopherfan
Metrodome
Posts: 61
Joined: January 15th, 2013, 5:09 pm

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby gopherfan » September 26th, 2017, 9:40 pm

Bakken2016 wrote:
September 26th, 2017, 6:16 am
gopherfan wrote:
September 17th, 2017, 4:08 pm
Caught a glimpse of one of the new C Line articulated bus going Southbound on 35W last week near the UofM operating as a route 250! Was driving, so no picture...
I work for MT, we have one articulated bus painted like an A Line(aBRT) because we were going to run it for the state fair, but due to construction on the ford parkway bridge they decided against it. So it is one of the newest Artics we have in our fleet, but not want the C Line buses will look like!
Yes it is actually the C Line livery! - https://www.metrotransit.org/c-line-faq ... eslooklike?
Image
Here's a pic as such Image

Bakken2016
Union Depot
Posts: 326
Joined: September 20th, 2017, 12:40 pm
Location: North Loop

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby Bakken2016 » September 27th, 2017, 11:40 am

gopherfan wrote:
September 26th, 2017, 9:40 pm
Bakken2016 wrote:
September 26th, 2017, 6:16 am
gopherfan wrote:
September 17th, 2017, 4:08 pm
Caught a glimpse of one of the new C Line articulated bus going Southbound on 35W last week near the UofM operating as a route 250! Was driving, so no picture...
I work for MT, we have one articulated bus painted like an A Line(aBRT) because we were going to run it for the state fair, but due to construction on the ford parkway bridge they decided against it. So it is one of the newest Artics we have in our fleet, but not want the C Line buses will look like!
Yes it is actually the C Line livery! - https://www.metrotransit.org/c-line-faq ... eslooklike?
Image
Here's a pic as such Image
My apologies I should have clarified, yes the that is the livery of the C Line bus, but that bus does not have 3 doors like the ones we are purchasing for the C Line.

WhoaCanyonero
Block E
Posts: 4
Joined: September 14th, 2017, 11:19 am

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby WhoaCanyonero » October 9th, 2017, 9:14 am

Metro Transit has confirmed that funding is in place with construction in 2018, service in 2019.

https://www.metrotransit.org/funding-in ... -bus-line-

Silophant
Moderator
Posts: 3525
Joined: June 20th, 2012, 4:33 pm
Location: The Gateway

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby Silophant » October 9th, 2017, 9:31 am

Great news! Hopefully the Met Council can find funding to make all twelve buses electric instead of just six.

alexschief
Nicollet Mall
Posts: 193
Joined: November 12th, 2015, 11:35 am
Location: Philadelphia

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby alexschief » October 10th, 2017, 3:32 pm

WhoaCanyonero wrote:
October 9th, 2017, 9:14 am
Metro Transit has confirmed that funding is in place with construction in 2018, service in 2019.

https://www.metrotransit.org/funding-in ... -bus-line-
Best news I've heard today so far!

The #19 bus is MSP's eighth busiest bus, with somewhere north of 6,000 weekday riders. I'm fascinated to see how ridership reacts to the C-Line improvements, and how that relates to the jump we saw with the A-Line. Will the increases be similar in absolute numbers? In percentages? Lots to learn from this, but either way, it will be a big boost to thousands of people daily.

Bakken2016
Union Depot
Posts: 326
Joined: September 20th, 2017, 12:40 pm
Location: North Loop

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby Bakken2016 » November 1st, 2017, 8:15 am

Due to construction on 8th St in downtown in 2019, the C Line will run on 6th until 8th St is completed.

Tcmetro
Wells Fargo Center
Posts: 1276
Joined: May 31st, 2012, 8:02 pm
Location: Chicago (ex-Minneapolitan)

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby Tcmetro » November 5th, 2017, 10:51 am

Bakken2016 wrote:
November 1st, 2017, 8:15 am
Due to construction on 8th St in downtown in 2019, the C Line will run on 6th until 8th St is completed.
I take it that the other buses on 8th St (5, 9, 19, 22) will also be rerouted to 6th St during construction?

Bakken2016
Union Depot
Posts: 326
Joined: September 20th, 2017, 12:40 pm
Location: North Loop

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby Bakken2016 » November 6th, 2017, 8:49 am

Tcmetro wrote:
November 5th, 2017, 10:51 am
Bakken2016 wrote:
November 1st, 2017, 8:15 am
Due to construction on 8th St in downtown in 2019, the C Line will run on 6th until 8th St is completed.
I take it that the other buses on 8th St (5, 9, 19, 22) will also be rerouted to 6th St during construction?
I am assuming so!

Silophant
Moderator
Posts: 3525
Joined: June 20th, 2012, 4:33 pm
Location: The Gateway

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby Silophant » February 19th, 2018, 10:38 am

Looks like the Met Council finally managed to get a bid that was within a project budget.

Also, it now says eight (of twelve, IIRC) buses will be electric. Awesome!

mamundsen
Wells Fargo Center
Posts: 1001
Joined: November 15th, 2012, 10:01 am

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby mamundsen » February 19th, 2018, 10:44 pm

From that article:
In the coming years, 10 more rapid-bus lines will snake throughout the metro’s busiest transit corridors
10? C and D. What else is the article referring to here?

DanPatchToget
Rice Park
Posts: 497
Joined: March 30th, 2016, 1:26 pm

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby DanPatchToget » February 19th, 2018, 10:55 pm

E on Hennepin, B on Lake, F...?

mamundsen
Wells Fargo Center
Posts: 1001
Joined: November 15th, 2012, 10:01 am

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby mamundsen » February 20th, 2018, 12:03 am

Sure... but those are in the early stages. Is the article including Orange, Gold and Rush lines too? That still only gets us to 6-7. Not 10.

Mikey
Landmark Center
Posts: 240
Joined: January 6th, 2015, 2:33 pm
Location: Gunflint Trail
Contact:

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby Mikey » February 20th, 2018, 8:31 am

Nicollet and Central, Arcade / Maryland / White Bear Ave, Robert St?

They're all technically on the long term map. Although at current funding rates, it'll be 20 years until even these are done, let alone others like Grand Ave and Rice St, possibly Randolph...
Urbanist in the north woods

Tcmetro
Wells Fargo Center
Posts: 1276
Joined: May 31st, 2012, 8:02 pm
Location: Chicago (ex-Minneapolitan)

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby Tcmetro » February 20th, 2018, 8:48 am

There were 11 lines in the Arterial BRT study. Snelling has been implemented, leaving 10 more (Hennepin, Nicollet, Central, Broadway, Penn, Chicago-Fremont, Lake, American, E 7th-W 7th, Robert).

Silophant
Moderator
Posts: 3525
Joined: June 20th, 2012, 4:33 pm
Location: The Gateway

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby Silophant » February 20th, 2018, 8:48 am

I'm pretty sure it's referring to the 10 remaining corridors from the aBRT study completed in 2012: Snelling (A), Lake (B), Penn (C), Chicago (D), Hennepin (E), Nicollet, Central, American, Robert, and E. 7th. W. 7th was the 11th corridor in the study, but was canned to not conflict with the streetcar study.

Edit: what Tcmetro said.

alexschief
Nicollet Mall
Posts: 193
Joined: November 12th, 2015, 11:35 am
Location: Philadelphia

Re: C Line - Arterial Rapid Bus & Penn Ave Community Works Project

Postby alexschief » February 20th, 2018, 9:11 am

I've been a bit confused by the truncated nature of some of these routes, which I think would really benefit from through-running. The D-Line is really good because the Minneapolis CBD is just the center of it. But the C-Line terminates downtown. I'd love to see it keep going, perhaps down Bloomington? I also haven't seen any indication that the B-Line is planned to continue past the East Lake Station, which would baffle me, it should replace the entire 21 all the way to St. Paul.

Some of the other corridors could be paired as well. Nicollet and Central should be one line from the Columbia Heights Transit Center to the Southdale Transit Center. The East 7th St. line should run through St. Paul's CBD and then run down Grand Ave to St. Thomas. The Robert St. line should run through St. Paul's CBD and continue up Rice...