Re: Central Corridor LRT

Postby mulad » August 9th, 2012, 12:28 am

Yeah, the Montgomery Wards appears to have been a rail-served building, much like the Lake Street Sears (Midtown Exchange) was. It was surrounded on the east and west by relatively empty space occupied by a web of rails leading to various sorts of industrial or warehouse buildings, if I'm interpreting this 1940 image (Warning: BIG) correctly.

Not far to the west, there were a lot of rails for the TCRT Snelling Shops to store streetcars for various lines. So don't get any false illusions that they tore down utopia here.

Actually, I didn't know until just now that some of the Midway shopping area dates back to the 1960s: Here's another (BIG) shot from 1969 showing the area after I-94 went in.

I do vaguely remember seeing the Montgomery Wards as a kid, though I doubt I ever visited. My family would sometimes go along I-94 or University Avenue as we traveled up to Fargo. I remember seeing a news report when it was imploded.

I'm sure it would have been great if it had stuck around, but it likely would have been just as difficult to redevelop as the Midtown Exchange was.

Tcmetro
Wells Fargo Center
Posts: 1775
Joined: May 31st, 2012, 8:02 pm
Location: Chicago (ex-Minneapolitan)

Re: Central Corridor LRT

Postby Tcmetro » August 9th, 2012, 8:43 am

Here's a link to yesterday's CCLRT meeting presentation: http://www.metrocouncil.org/transportat ... 808PPT.pdf

Loads of pics in there, Siemens cars 201 and 202 to be shipped soon, with another 6 in production. Lots of construction pics too.

Went down University the other day, looks like roadway construction on the north side will be complete to Dale St. in a week or two, after sidewalks are poured. Roadwork is coming along much faster than last year it seems.

User avatar
spectre000
Landmark Center
Posts: 284
Joined: May 31st, 2012, 9:05 pm
Location: Downtown St. Paul

Re: Central Corridor LRT

Postby spectre000 » August 9th, 2012, 10:41 am

If only work on Cedar St in downtown would speed up. Between 7th and 12th it's still a nightmare. They finally started some roadwork around the 10th St station so cars can now cross eastward. But 11th is now closed. 5th is closed. Progress on the Cedar St bridge is coming along. I really hope by November all of Cedar (road-wise) is finished. The gound has been dug up for so long in front of MPR and the next door churches I can't even remember a street there.

moda253
Nicollet Mall
Posts: 142
Joined: June 27th, 2012, 3:28 pm
Contact:

Re: Central Corridor LRT

Postby moda253 » August 10th, 2012, 12:18 pm

I used to live very near the MW building. It was a dump and falling apart in the end. Even while it was in use I don't believe much of the big tower portion of the building was safe.

User avatar
FISHMANPET
IDS Center
Posts: 4241
Joined: June 6th, 2012, 2:19 pm
Location: Corcoran

Re: Central Corridor LRT

Postby FISHMANPET » August 11th, 2012, 5:22 pm

Washington Ave bridge closes on the 20th for a week, apparently to lay rail. They're going to blitz it before school starts rather than doing it slowly over weekends during the school year

UptownSport
Target Field
Posts: 577
Joined: July 23rd, 2012, 12:07 am

Re: Central Corridor LRT

Postby UptownSport » August 11th, 2012, 11:49 pm

The ground has been dug up for so long in front of MPR ... I can't even remember a street there.
a little 'payback'?

web

Re: Green Line (Central)

Postby web » August 13th, 2012, 9:30 pm

I heard they are building special section thru there.......I think mpr got a morsel

mattaudio
Stone Arch Bridge
Posts: 7759
Joined: June 19th, 2012, 2:04 pm
Location: NORI: NOrth of RIchfield

Re: Green Line (Central)

Postby mattaudio » August 14th, 2012, 7:32 am

A floating slab, right? And maybe they're doing some sort of special caisson up against the MPR and church foundations... It looked dug out very deep when I was there a week ago.

NickP
Target Field
Posts: 509
Joined: June 4th, 2012, 5:00 pm

Re: Green Line (Central)

Postby NickP » August 14th, 2012, 8:21 am

Yeah, they are putting in a floating slab. It is supposed to mitigate against noise caused by the trains correct?

go4guy
Foshay Tower
Posts: 921
Joined: June 4th, 2012, 8:54 am

Re: Green Line (Central)

Postby go4guy » August 14th, 2012, 9:36 am

So, will it be in 5 or 10 years when they have to completely re-do the Washington Ave bridge and shut down the light rail for 2 years? I still cannot believe they didnt do this initially. That bridge is a pile. I remeber when the outside portion of the upper level was closed because they felt the support was not sufficient. Huge mistake there.

mulad
Moderator
Posts: 2753
Joined: June 4th, 2012, 6:30 pm
Location: Saint Paul
Contact:

Re: Green Line (Central)

Postby mulad » August 14th, 2012, 10:02 am

The Washington Avenue Bridge has been significantly strengthened. Each of the supporting piers has had two new columns added, going from 3 to 5. Atop the new columns, there are new bridge members. The bridge used to have 4 main members, now there are 8. These images show the south side partway through reconstruction (the north side was reconstructed later):

Image
img_4476 by Mulad, on Flickr

Image
img_4460 by Mulad, on Flickr

In this process, the bridge has also been made structurally redundant (no longer "fracture critical"). It should last a long time.

Of course, the enclosure on the pedestrian level is definitely in poor shape and needs to be repaired or replaced, but that doesn't have anything to do with the main structure/superstructure of the bridge.

User avatar
FISHMANPET
IDS Center
Posts: 4241
Joined: June 6th, 2012, 2:19 pm
Location: Corcoran

Re: Green Line (Central)

Postby FISHMANPET » August 14th, 2012, 10:09 am

I remeber when the outside portion of the upper level was closed because they felt the support was not sufficient. Huge mistake there.
They fixed it, not sure what the mistake is.

612transplant
Nicollet Mall
Posts: 162
Joined: June 6th, 2012, 7:57 am

Re: Green Line (Central)

Postby 612transplant » August 14th, 2012, 11:20 am

^^^Thank God they're fixing the Wash Ave Bridge. We've known it was in trouble ever since MNDOT took inventory of bridges statewide-- before 35W collapsed, I believe? I'm surprised there wasn't more impetus to fix it after 35W collapsed, but I guess waiting for the LRT is a reasonable excuse....

Minneapolisite

Re: Green Line (Central)

Postby Minneapolisite » August 15th, 2012, 6:32 pm

It's from mid May, but I thought this thread could use more pictures, so here's University & Snelling: Image

I rode from Snelling one weekend down University all the way to Camdi for lunch: barely any cars to watch out for on some rather long stretches where University was reduced to one lane.

User avatar
FISHMANPET
IDS Center
Posts: 4241
Joined: June 6th, 2012, 2:19 pm
Location: Corcoran

Re: Green Line (Central)

Postby FISHMANPET » August 15th, 2012, 7:42 pm

So crossing the Washington Ave bridge today I can see what they're putting in the rail lanes to get ready. It looks like the rails are going to be raised a foot or two off the deck of the bridge? Can't get a picture from the bus, but they've drilled small holes to put L bolts into, so there's about 6-8 inches or rebar parallel to the bridge deck, then they've got wire loops they're connecting those with, and then they've put these huge green "things" on top of those, not sure how else to describe it.

User avatar
LRV Op Dude
Union Depot
Posts: 328
Joined: July 7th, 2012, 10:30 am
Contact:

Re: Green Line (Central)

Postby LRV Op Dude » August 16th, 2012, 9:42 am

[youtube]https://www.youtube.com/watch?v=N1gkt6xWgIg[/youtube]

Video of the Green Line constrution between Snelling Ave Station and Union Station
Blog: Old-Twin Cities Transit New-Twin Cities Transit

You Tube: Old, New

AKA: Bus Driver Dude

UptownSport
Target Field
Posts: 577
Joined: July 23rd, 2012, 12:07 am

Re: Green Line (Central)

Postby UptownSport » August 16th, 2012, 5:10 pm

I remeber when the outside portion of the upper level was closed because they felt the support was not sufficient. Huge mistake there.
They fixed it, not sure what the mistake is.
Right after they laid out all 35W bent beams below N side- Could say conspiracy.

I recall they used to drive an S-10 job truck on upper lever- It'd be about impossible for enough peds and bikes to outweigh that- Unless they were standing on eachother's shoulders

mulad
Moderator
Posts: 2753
Joined: June 4th, 2012, 6:30 pm
Location: Saint Paul
Contact:

Re: Green Line (Central)

Postby mulad » August 18th, 2012, 4:11 pm

Thanks for the video, LRV Op Dude.

I walked along the line from Raymond & University to the UMN campus and noticed several things.

The median spaces between tracks and the roadway allocated to plants are starting to get filled in. Looks like there may be a mix of native flowers and grasses (but I'm not a botanist...).

Image
Image

No tracks in place at the Minneapolis-St. Paul border quite yet, but it looks like there's a U-shaped guideway in place. (I don't really understand why they do that in some places but not others, though I'm sure there are reasons.)

It looks like an additional building has been demolished along 29th Ave next to the Overflow Cafe. I thought they were just going to shave off a corner of it, but for now it just looks like a gravel parking lot. Rails are in place along 29th Ave, and curbs have been poured between the transitway and 4th Street.

Image

The guideway area next to the bus transitway has been graded, but no rebar or concrete yet (except for foundations for catenary poles).

Image

Rails and curbs are in place through at least most of the Washington/Huron/University intersection area, and rails are in the process of being embedded along Washington between Huron and Oak Street.

Image
Image
Image

Some new sidewalks are going in, including a mid-block pedestrian crossing leading straight into the University Hotel Minneapolis (former Radisson Metrodome).

Image

U-shaped guideway partly in place along Washington through the heart of campus

Image
Image

(Bigger images available in my "Transit Stuff" Picasa set)

I didn't notice any "green things" other than some tubes sticking out of the ground and rebar, though there were a bunch of rectangular black concrete boxes sitting around.

Boy, route #2 will look so unnatural next week with the Washington Avenue Bridge closed. Looks like they'll do a zig-zag into Dinkytown and back out to 10th Ave. Not that the 2's normal route looks natural at all ;)

User avatar
FISHMANPET
IDS Center
Posts: 4241
Joined: June 6th, 2012, 2:19 pm
Location: Corcoran

Re: Green Line (Central)

Postby FISHMANPET » August 18th, 2012, 10:56 pm

I didn't notice any "green things" other than some tubes sticking out of the ground and rebar, though there were a bunch of rectangular black concrete boxes sitting around.

Boy, route #2 will look so unnatural next week with the Washington Avenue Bridge closed. Looks like they'll do a zig-zag into Dinkytown and back out to 10th Ave. Not that the 2's normal route looks natural at all ;)
The green things are only on the bridge, though they could be some kind of form that will be removed once the rails are in.

And at this point the majority of the 2 is Detour, I look forward to commuting next week.

Didier
Capella Tower
Posts: 2511
Joined: June 3rd, 2012, 10:11 am
Location: MSP

Re: Green Line (Central)

Postby Didier » August 18th, 2012, 11:13 pm

Great pictures. I can also note that the actual road is pretty much done between Raymond and Snelling now.