Postby mattaudio » February 22nd, 2017, 11:15 am

You'd think there's a way to activate your vacant parcels (and maybe even generate some revenue!) while you await those ambitious projects. I mean, come on. https://goo.gl/maps/Y7Q3teN5qMD2 Get some hipsters and shipping containers, stat!

Chef
Landmark Center
Posts: 282
Joined: June 3rd, 2012, 7:33 pm

Re: Mozaic (all phases)

Postby Chef » February 22nd, 2017, 5:50 pm

The thing is though that Ackerberg has failed at building anything other than a taxpayer subsidized parking ramp. I don't think there are glorious projects at the end of the rainbow, just eternally vacant lots. I don't think he is ever going to get anything built. His hotel got beat to the market by a competitor. The first draft of Mozaic was great but by the time it was ready, the market for condos had collapsed. How long has the lot next to Calhoun Square been vacant? When I moved here in 1987 it was surface parking. How much longer should we wait, twenty years, fifty years? A five story midrise is better than a beautiful project that will never be built. All we are getting is a scar in Uptown's urban fabric that never goes away.

seanrichardryan
IDS Center
Posts: 4092
Joined: June 3rd, 2012, 9:33 pm
Location: Merriam Park, St. Paul

Re: Mozaic (all phases)

Postby seanrichardryan » February 23rd, 2017, 7:15 am

Image
Q. What, what? A. In da butt.

Minneboy
US Bank Plaza
Posts: 669
Joined: January 15th, 2013, 1:18 pm

Re: Mozaic (all phases)

Postby Minneboy » February 23rd, 2017, 6:17 pm

The thing is though that Ackerberg has failed at building anything other than a taxpayer subsidized parking ramp. I don't think there are glorious projects at the end of the rainbow, just eternally vacant lots. I don't think he is ever going to get anything built. His hotel got beat to the market by a competitor. The first draft of Mozaic was great but by the time it was ready, the market for condos had collapsed. How long has the lot next to Calhoun Square been vacant? When I moved here in 1987 it was surface parking. How much longer should we wait, twenty years, fifty years? A five story midrise is better than a beautiful project that will never be built. All we are getting is a scar in Uptown's urban fabric that never goes away.
That's not quite true. My house I bought in 1990 a block away and there was a Taco Bell there until around 93.

MNdible
is great.
Posts: 5989
Joined: June 8th, 2012, 8:14 pm
Location: Minneapolis

Re: Mozaic (all phases)

Postby MNdible » February 23rd, 2017, 10:06 pm

Wasn't that the Music-Go-Round on that block as well?

Minneboy
US Bank Plaza
Posts: 669
Joined: January 15th, 2013, 1:18 pm

Re: Mozaic (all phases)

Postby Minneboy » February 24th, 2017, 5:54 am

Yes and that didn't leave until after I moved away in 2005.

User avatar
Nathan
Capella Tower
Posts: 3695
Joined: June 1st, 2012, 10:42 am

Re: Mozaic (all phases)

Postby Nathan » February 24th, 2017, 11:12 am

Well. 12 years is so much better. Good talk.

MNdible
is great.
Posts: 5989
Joined: June 8th, 2012, 8:14 pm
Location: Minneapolis

Re: Mozaic (all phases)

Postby MNdible » February 24th, 2017, 11:59 am

I don't love the fact that it's sitting empty either, but there's a huge difference between 30 years and 12 years, especially since there was a massive recession that chewed up a lot of those years (and sent a lot of projects back to the drawing boards).

twincitizen
Moderator
Posts: 6368
Joined: May 31st, 2012, 7:27 pm
Location: Standish-Ericsson

Re: Mozaic (all phases)

Postby twincitizen » February 24th, 2017, 4:19 pm

True, but I think the criticism that Ackerberg hasn't built squat in this cycle is a fair one. Ackerberg is a property owner/manager, not a developer. It's absurd that this site continues to sit empty. If a hotel doesn't pencil out and/or you can't attract a large office tenant, sell to CPM so they can build another 6-story apartment building with some retail/office space and cash the damn check.

Chef
Landmark Center
Posts: 282
Joined: June 3rd, 2012, 7:33 pm

Re: Mozaic (all phases)

Postby Chef » February 24th, 2017, 5:30 pm

Music Go Round was only half the block. The other half was a surface parking extension of the Calhoun Square ramp. I use to park there when Ravenswood Books was still in Calhoun Square, which was in the early '90s.

seanrichardryan
IDS Center
Posts: 4092
Joined: June 3rd, 2012, 9:33 pm
Location: Merriam Park, St. Paul

Re: Mozaic (all phases)

Postby seanrichardryan » February 24th, 2017, 5:56 pm

And before it was taco bell, that lot was..... parking!
Q. What, what? A. In da butt.

TroyGBiv
US Bank Plaza
Posts: 658
Joined: July 6th, 2012, 10:33 pm

Re: Mozaic (all phases)

Postby TroyGBiv » February 25th, 2017, 9:56 pm

And before it was taco bell, that lot was..... parking!
And before that Zantigo!

seanrichardryan
IDS Center
Posts: 4092
Joined: June 3rd, 2012, 9:33 pm
Location: Merriam Park, St. Paul

Re: Mozaic (all phases)

Postby seanrichardryan » February 26th, 2017, 1:19 pm

and billboards. Image
Q. What, what? A. In da butt.

twincitizen
Moderator
Posts: 6368
Joined: May 31st, 2012, 7:27 pm
Location: Standish-Ericsson

Re: Mozaic (all phases)

Postby twincitizen » February 27th, 2017, 9:39 am

I wish to partially retract my previous comment condemning Ackerberg for not building anything. As it turns out, Ackerberg has owned Calhoun Square for just under 3 years. So while the site has been fully vacant for ~12 years (and at least partially vacant much longer, thanks everyone for the history) it's been less than 3 years under current ownership.

So while I can give Ackerberg a break on those grounds, the rest of my comment stands - Ackerberg hasn't built squat this boom cycle, aside from Mozaic itself, which arguably has one foot in the pre-recession era, one foot in the current boom.

MNdible
is great.
Posts: 5989
Joined: June 8th, 2012, 8:14 pm
Location: Minneapolis

Re: Mozaic (all phases)

Postby MNdible » February 27th, 2017, 10:14 am

Are you referring specifically to Uptown? Because they've definitely done projects around town.

aeisenberg
Landmark Center
Posts: 269
Joined: June 12th, 2012, 7:45 pm

Re: Mozaic (all phases)

Postby aeisenberg » April 10th, 2017, 1:51 pm

The parking lot behind Lagoon closes next week in anticipation of construction. This is happening.
Aaron Eisenberg / Realtor, Keller Williams Integrity
612.568.5828 / [email protected] / 1350 Lagoon Ave #900
http://www.agentaaron.com

grant1simons2
IDS Center
Posts: 4371
Joined: February 8th, 2014, 11:33 pm
Location: Marcy-Holmes

Re: Mozaic (all phases)

Postby grant1simons2 » April 10th, 2017, 1:53 pm

WHAT

acs
Wells Fargo Center
Posts: 1364
Joined: March 26th, 2014, 8:41 pm

Re: Mozaic (all phases)

Postby acs » April 10th, 2017, 1:54 pm

No way. Didn't permits expire?

TroyGBiv
US Bank Plaza
Posts: 658
Joined: July 6th, 2012, 10:33 pm

Re: Mozaic (all phases)

Postby TroyGBiv » April 10th, 2017, 2:48 pm

Weird that it hasn't been in the news recently...

twincitizen
Moderator
Posts: 6368
Joined: May 31st, 2012, 7:27 pm
Location: Standish-Ericsson

Re: Mozaic (all phases)

Postby twincitizen » April 10th, 2017, 3:00 pm

No way. Didn't permits expire?
The approvals for this project would have expired on September 29, 2016, according to the Planning Commission report.