420 East Hennepin
-
- Wells Fargo Center
- Posts: 1331
- Joined: June 8th, 2012, 1:39 pm
- Location: George Floyd Square
Re: 420 E Hennepin Ave
There are jersey barriers up onsite and traffic lanes have been reconfigured with paint included, so guessing we are going to see construction immediately following demo. Utility contractors and equipment onsite as well now.
-
- Wells Fargo Center
- Posts: 1331
- Joined: June 8th, 2012, 1:39 pm
- Location: George Floyd Square
Re: 420 E Hennepin Ave
Building came down today.
-
- Metrodome
- Posts: 59
- Joined: March 31st, 2014, 2:55 pm
Re: 420 East Hennepin
Quite the sight.
-
- IDS Center
- Posts: 4093
- Joined: June 3rd, 2012, 9:33 pm
- Location: Merriam Park, St. Paul
Re: 420 East Hennepin
They were to pretty dismal buildings. Glad to see it.
Q. What, what? A. In da butt.
Re: 420 East Hennepin
I wish we knew what they are doing here. Did they take over the previous plans from the other developer?
Re: 420 East Hennepin
YesI wish we knew what they are doing here. Did they take over the previous plans from the other developer?
Re: 420 East Hennepin
It appears that construction from now on up will be wood construction? I thought buildings over a certain height (5 stories?) had to be concrete. Is it allowed that the top stories are allowed to be wood even if the overall project exceeds that height?
-
- Landmark Center
- Posts: 216
- Joined: July 6th, 2012, 11:31 am
Re: 420 East Hennepin
I am not an expert on building codes, but you can go 5 stories of wood construction plus an mezzanine over a single level (first level) of concrete for a total of 7 floors.It appears that construction from now on up will be wood construction? I thought buildings over a certain height (5 stories?) had to be concrete. Is it allowed that the top stories are allowed to be wood even if the overall project exceeds that height?
In some markets they have been doing the same but with 2 levels of concrete to get 8 floors. Not sure if MN building codes allow for that or not.
Re: 420 East Hennepin
My understanding is that, up until 2020, Minnesota was using the 2012 International Building Code, which allowed up to 5 stories of Type III (wood) construction on top of a one story podium of Type I (concrete or steel) construction, with a max height of 85'. This gave us the 5+1 apartment building we know and love, though there's a few exceptions with mezzanines that occasionally allow buildings to look like 7 stories instead of 6 from the outside, like East End in the Mill District and the Walkway in Uptown.
In 2020, Minnesota updated to the 2018 IBC, which still has the 5 stories of Type III and 85' max height limitations, but no longer limits the number of stories that the Type I podium can be. So, with shorter floor-to-floor heights to fit into the 85' max, you can now do 7 true stories and a mezzanine to get to effectively 8 stories, like this building will be.
In 2020, Minnesota updated to the 2018 IBC, which still has the 5 stories of Type III and 85' max height limitations, but no longer limits the number of stories that the Type I podium can be. So, with shorter floor-to-floor heights to fit into the 85' max, you can now do 7 true stories and a mezzanine to get to effectively 8 stories, like this building will be.
Joey Senkyr
[email protected]
[email protected]
Re: 420 East Hennepin
It was the 2015 code cycle that allowed more than 1 level below the 3-hr podium lid but everything else is spot on.
-
- Nicollet Mall
- Posts: 161
- Joined: May 19th, 2015, 10:50 pm
- Location: Downtown
-
- Nicollet Mall
- Posts: 161
- Joined: May 19th, 2015, 10:50 pm
- Location: Downtown
-
- Nicollet Mall
- Posts: 161
- Joined: May 19th, 2015, 10:50 pm
- Location: Downtown
Re: 420 East Hennepin
View from Central. I'm liking how this wraps the older buildings, and the white metal panel is a nice contrast to the brick.
Looks like the project is called HenCen now, at least according to Solhem's website. Spring 2023 opening.
https://www.solhem.com/portfolio/hencen
Looks like the project is called HenCen now, at least according to Solhem's website. Spring 2023 opening.
https://www.solhem.com/portfolio/hencen
Re: 420 East Hennepin
Still virtual tours only, waiting for in person to be available, no date given.
-
- Metrodome
- Posts: 85
- Joined: July 16th, 2013, 6:25 pm
Re: 420 East Hennepin
It should have been named CenHen not HenCen:View from Central. I'm liking how this wraps the older buildings, and the white metal panel is a nice contrast to the brick.
Looks like the project is called HenCen now, at least according to Solhem's website. Spring 2023 opening.
https://www.solhem.com/portfolio/hencen
https://www.startribune.com/neighborhoo ... 370387551/
https://streets.mn/2015/08/17/niebna-ol ... ess-place/
-
- IDS Center
- Posts: 4093
- Joined: June 3rd, 2012, 9:33 pm
- Location: Merriam Park, St. Paul
Re: 420 East Hennepin
Toured on Saturday. Construction in the shared areas have a ways to go, but some units are good to go. Looks nice.
Who is online