Street, Road and Highway Projects

Roads - Rails - Sidewalks - Bikeways
Trademark
US Bank Plaza
Posts: 642
Joined: March 31st, 2019, 11:22 am

Re: Street, Road and Highway Projects

Postby Trademark » December 11th, 2022, 1:16 pm

Provide feedback on plans for the 98th & Lyndale area in Bloomington: https://letstalk.bloomingtonmn.gov/west ... l#tool_tab

One concept even includes bus lanes! I assume they would only be a short distance, and I'm not sure if a general lane in each direction would be removed for it, but still surprising that it's being considered.
From the plans it only looks like it would be eastbound for the orange line before it turns into the transit station. Wish they could consider an online station as part of this project.

Mdcastle
Wells Fargo Center
Posts: 1217
Joined: March 23rd, 2013, 8:28 am
Location: Bloomington, MN

Re: Street, Road and Highway Projects

Postby Mdcastle » December 12th, 2022, 7:50 am

Even though the bridge is going to need to be replaced in the next 15 years, building an inline station doesn't seem to be on anyone's radar.

MNdible
is great.
Posts: 6000
Joined: June 8th, 2012, 8:14 pm
Location: Minneapolis

Re: Street, Road and Highway Projects

Postby MNdible » February 7th, 2023, 1:11 pm

The City and County are making plans to reconstruct the 1st Avenue S, 10th Avenue S, Nicollet Avenue S and Pillsbury Avenue S Bridges over the Midtown Greenway.

Source.

StandishGuy
Nicollet Mall
Posts: 140
Joined: January 29th, 2021, 4:24 pm

Re: Street, Road and Highway Projects

Postby StandishGuy » March 14th, 2023, 2:45 pm

Hennepin County has begun planning for the reconstruction of Franklin Avenue (Street?) between Lyndale and Chicago Avenues. This presentation prepared for the Minneapolis Bicycle and Pedestrian Advisory Committees gives more details: https://lims.minneapolismn.gov/download ... esentation

By the way anyone here have thoughts about the newly reconstructed section of Franklin between Hennepin and Lyndale? I haven't been over there in ages.

daveybabymsp
Nicollet Mall
Posts: 121
Joined: December 30th, 2021, 12:19 pm

Re: Street, Road and Highway Projects

Postby daveybabymsp » March 14th, 2023, 3:02 pm

New Franklin between Hennepin and Lyndale is pretty good. Crossing on Bryant to get to the ped/bike overpass is much better now with a median/refuge. Since it’s really short and the sections on either side are less bike friendly I haven’t tried biking it yet. Could see it getting a lot more bike ridership with Hennepin reconstruction and this project getting built


Sent from my iPhone using Tapatalk

alexschief
Wells Fargo Center
Posts: 1147
Joined: November 12th, 2015, 11:35 am
Location: Minneapolis

Re: Street, Road and Highway Projects

Postby alexschief » March 14th, 2023, 4:30 pm

Without annotation of those road widths, it's a bit hard to understand how they can do sidewalks and bikeways on Segment 4 and not on Segment 2, despite both having the same effective width (and Segment 4 even having a narrower legal width). I am guessing they are planning on taking more of the legal ROW for Segment 4?

A thing that sometimes bugs me about these plans is that consistency is not listed specifically as a value. But I think consistency is actually extremely important for any transportation user of any mode. There is a hodgepodge of bicycle facility designs in the city and it feels like we are finally coalescing around a house style; with dark stained concrete at the sidewalk level and a (not absolute) preference for having a wider cycletrack on one side versus narrower lanes on both sides. Here however, because of the way that Franklin was built between Hennepin and Lyndale, it's important to be consistent and have bikeways on both sides of the street. These plans do that, which is a good step. But then they also envision a different road design at Segment 2 right in the middle, which kind of sabotages the intention. Is it really not possible to use the same general design throughout the corridor? I wish consistency were a higher priority.

Tyler
Foshay Tower
Posts: 977
Joined: June 1st, 2012, 10:10 am

Re: Street, Road and Highway Projects

Postby Tyler » March 15th, 2023, 9:12 am

I totally agree. I think constancy is important as a user but even more so because inconsistency leads to drivers doing stupid shit.
Towns!

COLSLAW5
Nicollet Mall
Posts: 164
Joined: April 11th, 2018, 1:20 pm

Re: Street, Road and Highway Projects

Postby COLSLAW5 » March 15th, 2023, 10:55 am

I think we also need to start doing raised crosswalks and this would be a perfect place to start.

COLSLAW5
Nicollet Mall
Posts: 164
Joined: April 11th, 2018, 1:20 pm

Re: Street, Road and Highway Projects

Postby COLSLAW5 » May 23rd, 2023, 6:54 am

Does Anyone know why they have been installing gate arms on the on ramps to 94. I noticed them on the east bound on ramps off hennepin and not they are on the west bound on ramp at Vandalia in st paul

seanrichardryan
IDS Center
Posts: 4092
Joined: June 3rd, 2012, 9:33 pm
Location: Merriam Park, St. Paul

Re: Street, Road and Highway Projects

Postby seanrichardryan » May 23rd, 2023, 8:34 am

I've been wondering the same thing. They appear to be manually operated, so maybe not 'security' infrastructure, such as quickly closing the freeway due to an emergency. Cursory search through their design standards didn't get any hits.
Q. What, what? A. In da butt.

commissioner
Nicollet Mall
Posts: 115
Joined: March 26th, 2013, 10:00 am

Re: Street, Road and Highway Projects

Postby commissioner » May 29th, 2023, 10:22 pm

I'm pretty sure they use them outstate to close whatever road they are on in the winter, but why they have them in the Twin Cities baffles me.

COLSLAW5
Nicollet Mall
Posts: 164
Joined: April 11th, 2018, 1:20 pm

Re: Street, Road and Highway Projects

Postby COLSLAW5 » May 30th, 2023, 10:21 am

Mndot got back to me and said they were looking to install these "for a couple of years" they are being installed for "namely for incident management purposes along the I-94 corridor"

Although there was a major crash blocking the vandalia on ramp today and they did not use them

Tom H.
US Bank Plaza
Posts: 627
Joined: September 4th, 2012, 5:23 am

Re: Street, Road and Highway Projects

Postby Tom H. » May 30th, 2023, 10:29 am

I'm going to guess that "incident management" is euphemistic for protesters on the freeway, not weather / crash related access management.

COLSLAW5
Nicollet Mall
Posts: 164
Joined: April 11th, 2018, 1:20 pm

Re: Street, Road and Highway Projects

Postby COLSLAW5 » May 31st, 2023, 7:10 am

Lol yea that is how I interpreted it too

commissioner
Nicollet Mall
Posts: 115
Joined: March 26th, 2013, 10:00 am

Re: Street, Road and Highway Projects

Postby commissioner » May 31st, 2023, 8:33 pm

I can see them being used if there was a big crash or major disaster/demonstration. I've lived here since 2000 and don't remember any freeway in the metro ever being shut down for weather.

DanPatchToget
Wells Fargo Center
Posts: 1661
Joined: March 30th, 2016, 1:26 pm

Re: Street, Road and Highway Projects

Postby DanPatchToget » June 1st, 2023, 4:02 am

Would they be used if the freeway is flooded? The only time I can recall a freeway in our region being flooded is 494 in Bloomington in 1987, possibly also 35W across the Minnesota River in 1965, but if we get a higher frequency of heavy rainfall events then it could make a flooded freeway more likely.

commissioner
Nicollet Mall
Posts: 115
Joined: March 26th, 2013, 10:00 am

Re: Street, Road and Highway Projects

Postby commissioner » June 2nd, 2023, 7:21 pm

IIRC 35W used to flood a couple times around Diamond Lake Road, but that was before they redid that interchange, I can't remember if it was a standalone project or if it was part of the 35W-62 project.

mamundsen
Wells Fargo Center
Posts: 1196
Joined: November 15th, 2012, 10:01 am

Re: Street, Road and Highway Projects

Postby mamundsen » June 4th, 2023, 11:27 am

Highway 36 Roseville to Maplewood survey closes today.

https://www.dot.state.mn.us/metro/proje ... index.html

gopherfan
Nicollet Mall
Posts: 130
Joined: January 15th, 2013, 5:09 pm

Re: Street, Road and Highway Projects

Postby gopherfan » June 5th, 2023, 8:54 am

On-ramp gate arms have also been installed from University Ave to 35W bridge... it seems like all the locations where they've had previous protestor problems.

Tcmetro
Wells Fargo Center
Posts: 1777
Joined: May 31st, 2012, 8:02 pm
Location: Chicago (ex-Minneapolitan)

Re: Street, Road and Highway Projects

Postby Tcmetro » June 7th, 2023, 2:42 pm

MnDot has concluded their 35W North Gateway study:

https://www.dot.state.mn.us/metro/proje ... index.html
Through an extensive technical analysis, it became apparent that several of the key metrics needed to be re-evaluated post COVID-19 pandemic. Instead of continuing with the study process, the project team decided to document the current work in a report. The report will be used to inform future area projects, though nothing has been scheduled for construction at this time.

...

Anticipated upcoming projects that will build on the I-35W North Gateway study include:
  • Studying long-range Hwy 36 improvements in Roseville, Little Canada and Maplewood for people traveling by vehicle or hauling freight, as well as those crossing the highway on foot or by bicycle
  • Increasing the functionality of University Ave. and SE 4th St. from Central Ave. to I-35W
  • Reconstructing all bridges within the I-35W North Gateway study limits by 2040. This includes redesigning the space for vehicles and people walking and bicycling to provide consistently safe and comfortable crossings of I-35W
  • University Ave. and SE 4th St. over I-35W in Minneapolis will be the first bridges to be reconstructed


Who is online

Users browsing this forum: No registered users and 44 guests