Metro Transit has posted the Aug 19 service change:
https://www.metrotransit.org/these-rout ... -on-aug-19
West End Restructuring:
9 - Simplified west end service to three branches.
25 - Extended to replace 9H and 649
604 - Louisiana Ave TC to West End service replaced by 645.
645 - Route 675 now stops at West End and is renumbered to 645. Local fares apply.
649 - Eliminated.
Service Improvements:
4 - Added peak hour trip reduces peak frequency to 8 minutes.
6 - 1 added SB PM peak trip.
365 - 3 trips stop at Newport P&R
Service Reductions:
3 - A/B branch service cut to every 60 minutes from every 30 on Saturdays.
17 - Trunk service reduced to every 30 min from every 15 min on Sat morning and Sundays
27 - Peak service reduced to every 30 min from every 10-20.
65 - Off-peak and Saturday reduced to every 30 min from every 20.
67 - Off-peak and Saturday reduced to every 30 min from every 20.
70 - First two and last two Saturday round trips eliminated.
83 - 5 SB and 7 NB trips eliminated, daily. Span of service reduced.
87 - Off-peak and Saturday reduced to every 30 min from every 20.
265 - 1 round-trip eliminated.
540 - last Saturday round-trip eliminated
542 - 4 trips eliminated
766 - Several morning and evening trips eliminated.
865 - Ham Lake and East Bethel service eliminated.
Misc.
5, 32 - 26th and Broadway terminal moved to 26th and Penn.
23 - Some peak trips change from Highland Park terminal to Vets Home terminal.
MVTA:
436 - 1 added evening trip.
442 - Hourly weekend service added.
465 - New weekday and weekend trips added to connect to 495. Timed for connections between U of M and Amazon Shakopee.
Minor time changes on various routes.