Re: Superior Plating site
Yup. As Grant said... They were tearing up the 4th St remains this morning. Definitely working on it again! I'm excited to see NE change with the additions of this, Nye's and the Alatus tower. I REALLY hope all three are amazing.
-
- US Bank Plaza
- Posts: 717
- Joined: June 1st, 2012, 11:11 am
Re: Superior Plating site
Glad to hear I was wrong! Will be nice to see this rising along with the others. Anxious to see an updated version of the US Bank building as well!
-
- IDS Center
- Posts: 4369
- Joined: February 8th, 2014, 11:33 pm
- Location: Marcy-Holmes
Re: Superior Plating site
I'd say this is a full go. Now there are 3 diggers on site, and trucks flowing in and out with rubble and dirt. It's great to finally see.
Re: Superior Plating site
I think this could be one of the most impactful projects of this housing boom. It's a great scale, it adds retail and amenities in a way that encourages good future urban development. I'm really excited for north east to become a dense urban village.
Re: Superior Plating site
I'm a little surprised the route that they are taking to haul away the debris. The large side-dump dumptrucks are taking Hennepin into downtown, then turning onto 3rd to get to the freeway. I saw a backed up line of alternating bus/dumptruck that was 2+ blocks long.
Re: Superior Plating site
I'll be glad to see this projects 1st phase done. I'm hoping it will be a catalyst for more retail and redevelopment along 1st Ave there. Will be nice to see the holes filled in from the north split to the river there on 1st. Right now it is a hit and a lot of miss for those that walk thru that area. While you do have the Red Stag and other shops, you have a lot of empty areas or large parking lots that can be put to better use. Need more doors on the street along there.
- FISHMANPET
- IDS Center
- Posts: 4233
- Joined: June 6th, 2012, 2:19 pm
- Location: Corcoran
Re: Superior Plating site
This is probably still cleanup work, as there don't appear to be any building permits pulled for the property.
-
- IDS Center
- Posts: 4369
- Joined: February 8th, 2014, 11:33 pm
- Location: Marcy-Holmes
Re: Superior Plating site
Took these on Saturday
DSC_0009 by grant.simons, on Flickr
DSC_0010 by grant.simons, on Flickr
DSC_0015 by grant.simons, on Flickr
DSC_0009 by grant.simons, on Flickr
DSC_0010 by grant.simons, on Flickr
DSC_0015 by grant.simons, on Flickr
-
- Moderator
- Posts: 6395
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: Superior Plating site
Also, Lennar is one of the largest builders in the country and have not (yet) built anything in Minneapolis proper. They have big projects underway near Southdale (6725 York - 270 units) and MOA (IndiGO - 420 units!). By all counts this Superior Plating project should be a smashing success, and it will almost certainly be the next new building to open in the area (there's like nothing under construction currently, right?) If things go well, I think we could reasonably expect that they'll do more projects in Minneapolis, should the market warrantI think this could be one of the most impactful projects of this housing boom. It's a great scale, it adds retail and amenities in a way that encourages good future urban development. I'm really excited for north east to become a dense urban village.
-
- Metrodome
- Posts: 86
- Joined: March 21st, 2014, 11:46 am
Re: Superior Plating site
just a bit down the road, 700 Central Ave NE is under active construction as well...
-
- Moderator
- Posts: 6395
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: Superior Plating site
I knew someone would mention that...I thought about including a disclaimer. I did say "new building" though
Rents at 700 Central will be targeted a fair amount lower (maybe ~$2.00/sf vs. >$2.30/sf for Superior).
Besides that one though, there is nothing else under construction or imminent, right? Even though Superior will take a bit longer to build, I still think it will be complete before the Nye's site (which still isn't approved...yet)
Rents at 700 Central will be targeted a fair amount lower (maybe ~$2.00/sf vs. >$2.30/sf for Superior).
Besides that one though, there is nothing else under construction or imminent, right? Even though Superior will take a bit longer to build, I still think it will be complete before the Nye's site (which still isn't approved...yet)
-
- IDS Center
- Posts: 4092
- Joined: June 3rd, 2012, 9:33 pm
- Location: Merriam Park, St. Paul
-
- Metrodome
- Posts: 86
- Joined: March 21st, 2014, 11:46 am
Re: Superior Plating site
Not quite the immediate area, but Restaurant Alma is/was planning on adding 6 rooms as a boutique hotel...that's about as close it gets.
-
- Metrodome
- Posts: 57
- Joined: January 15th, 2013, 9:07 pm
Re: Superior Plating site
Anyone else think the backside of The Pinnacle is ugly? Really noticed it in the above photo. That's all!
Re: Superior Plating site
OHHHH yes! I go to school at Aveda and was thinking how horrid it was yesterday when I was walking to the 11.Anyone else think the backside of The Pinnacle is ugly? Really noticed it in the above photo. That's all!
Re: Superior Plating site
It is all about the river front views. The big blank space is the elevator shaft. Due to the Falls the tower was pushed back as far as it could to get the most of the river front views.OHHHH yes! I go to school at Aveda and was thinking how horrid it was yesterday when I was walking to the 11.Anyone else think the backside of The Pinnacle is ugly? Really noticed it in the above photo. That's all!
-
- Moderator
- Posts: 6395
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: Superior Plating site
It's so bad I would entertain the idea of fake windows, or just about anything to break up that 25-story blank wall.
What would our resident architects suggest?
What would our resident architects suggest?
Re: Superior Plating site
It could be one hell of a mural.
-
- Moderator
- Posts: 6395
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: Superior Plating site
25 Bob Dylans it is!
-
- Metrodome
- Posts: 86
- Joined: March 21st, 2014, 11:46 am
Re: Superior Plating site
It'd make a hell of a rock climbing wall!